Arkansas Department of Transportation Date: 1/14/ Bid
Jan 12, · 0011 - 412001 - cold milling asphalt pavement - 116,801.000 sqyd pine02 pine bluff sand & gravel co. 2.15 251,122.15 reds10 redstone const. group, inc. 3.00 350,403.00 0012 - 414011 - asphalt concrete patching for maintenance of traffic - 300.000 ton pine02 pine bluff sand & gravel co. 50.00 15,000.00 reds10 redstone const. group, inc. 226.76
Learn More
PDF Facilities Development Manual
Chapter 14 Pavements Section 1 General FDM 14-1-1 General May 17, 1.1 Originator The Chief of the Materials Management Section in the Bureau of Technical Services is the Originator of this chapter. 1.2 Objective A roadway pavement is a structure of superimposed layers of select materials placed on the existing subgrade.
Learn More
SECTION 17 ASPHALT CONCRETE PAVEMENT
Specifications for Bridge Construction Section 17, Asphalt Concrete Pavement B383-05 17 - 4 OTHER SPECIFIED TESTS 1. Mix Asphalt Content AASHTO T-164, T287 or ATT-12 or ATT-74 Minimum of one per lift. 2. Correction Factors ATT-12, Part III or ATT-74, Part II Once for each mix design. 3. Mix Moisture Content ATT-15 Minimum of one per lift. 4.
Learn More
CONSTRUCTION STANDARDS SECTION CS 5 ASPHALT
Asphalt Concrete Construction Standards Page CS 5-1 CS-SEC 05 REV: 13 February 2007 CONSTRUCTION STANDARDS SECTION CS 5 ASPHALT CONCRETE CS 5-01 GENERAL: Furnishing, spreading and compacting Asphalt Concrete shall be in conformance with Section 39, “Asphalt Concrete” of the CALTRANS
Learn More
LA DOTD - Notice to Contractors
Sawing and Sealing Transverse Joints in Asphalt Concrete Overlay : LNFT: 240: 0057: NS-500-00260: Sawcuts in Asphalt Concrete Lifts : LNFT: 240: 0058: NS-500-00340: Saw Cutting Asphalt Concrete Pavement : INLF: 97: 0059: NS-500-00360: Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement : INLF: 18,840: 0060
Learn More
Chapter 4: Construction Details, Section 73: Concrete
4-7301 General. This section provides guidelines for inspecting concrete curbs, sidewalks, and their appurtenances, such as gutter depressions, island paving, curb ramps, and driveways. For specifications about the construction of concrete curbs and sidewalks, refer to Section 73, "Concrete Curbs and Sidewalks," of the Standard Specifications.
Learn More
18MCO532 ADDENDUM 1 and Question Answer
Concrete pitched pavement section lengths vary by each installation. Quantities broken down into individual 32’ x 25’ sections for ease of quantifying. (Example: At Sta. 10+100, the plans call for 32’ x 175’ pitched concrete pavement section which equates to seven (7) – 32’ x 25’ pitched concrete pavement
Learn More
PDF Section F: Surf acing Plans - South Dakota
Remove Asphalt Concrete Pavement (See Section B -Grading) Unclassified Excavation ·o.· 2' MAINLINE -SD38 Sta. 1020+50 to Sta. 1029+40.84 Sta. 1030+29.17 to Sta. 1039+00 In Place Section Showing Material to be Removed 14' 12' 12' MAINLINE -SD 38 Sta. 1020+50 to Sta. 1028+51.11 PCC or AC Pavement Asphalt Concrete Edge of Mainline PCC or
Learn More
B21 Sugarloaf Regional Airport Draft
into units called sections. A section is a portion of the pavement that has uniform construction history, pavement structure, traffic patterns, and condition throughout its entire length or area. Sections are used as a management unit for the selection of potential M&R projects.
Learn More
Thermal Stability Analysis under Embankment with Asphalt
In order to further narrate the ground temperature difference between both pavements, Table 1 gives the annual average temperature of 2003-2006 years under asphalt pavement in the section K417+970 of seasonally frozen ground and cement pavement in the section K418+030 of permafrost, as well as the difference between them at the depths of 0.5-2.0 m.
Learn More
PDF Standard Specifications
S T A N D A R D S P E C I F I C A T I O N S EDITION The Standard Specifications for road and bridge construction in Mississippi have been prepared, examined and recommended in the manner and form set
Learn More